October 2011 Route Changes
October 2011 Route Updates
Effective October 16, 2011 the following route changes will be permanent:
Route 1 McRae Thumbnail
Route 1 Hospital between McRae Street and Stanley Avenue
Will operate between McRae Street and Stanley Avenue via Slater Street, Jepson and Valley Way.
Route 1 Main Thumbnail
Route 1 Hospital between Stanley Avenue and Main Street
Will operate between Stanley Avenue and Main Street via Stanley Avenue, Murray Street and Main Street.
Route 3 Thumbnail
Route 3 Westlane
Will operate via Westwood, Pitton and Catalina in both directions.
Route 6 Chippawa Thumbnail
Route 6
Will operate Sodom Road loop on every trip. The Chippawa Parkway - Front Street loop has been eliminated.